Scope: PWG
UPGRADE
Energy
none
System
Upgrade
Figure Group
Figure Image
Figure image (.eps)
Figure Caption
ITS2 in the clean room during on-surface commissioning. The lower left shows a zoomed-in view of the half barrels of the outer barrel (OB) and inner barrel (IB) type.
Detail description
Figure extracted from paper